

Green Man 2024
We provided full production for Einstein's Garden within Green Man festival.
We were given the opportunity to pitch a full upgrade in terms of tech for the Einstein's Garden area after our previous work with Green Man as engineers between 2021-2023. We were delighted when the production team decided to go with our design and ideas!
For our OMNI Tent Stage, We provided -
A dedicated AV Engineer and Crew member
A corporate PA with wireless headset and handheld mics
An 85" TV that was able to be hidden and incorporated into a designed set, alongside a HD Video switcher
Decorative stage lighting which complimented the set, plus ample front lighting
Dedicated audio feeds for BBC Radio4 Broadcast
For our Solar Stage, We provided -
A dedicated Sound Engineer and Crew member
A band PA with a wireless mixing console and full band mic package]
4 Monitor wedges and IEM lines
A basic lighting setup to complement the surroundings
Power in Numbers
%20(2).png)
4
XEP Crew
%20(3).png)
30
Bands/Performers
%20(4).png)
25000
Audience experiences made
Project Gallery



